Infrastructure
Project: West Gate
Client: Fareham Borough Council
Service: Civil Engineering
The client’s brief was for Cowan Consultancy to provide services for the design of a car park and access road which is servicing a children’s play area and public open space.
Cowan Consultancy were involved from pre-planning through to the design, tender and construction stages up until practical completion.
Our services included;
– A schedule of works and a CDM 2015 Pre-Construction information pack was drafted to assist the tender process.
– General Arrangement layouts of the car park to include the appropriate signage.
– Construction details showing the build-up of the access road and car park.
– Design of cantilever gates
– A drainage scheme was designed to cater for the surface water.
– Regular construction stage site visits were undertaken to ensure the design was implemented correctly.
– Issue of practical completion certificate
![https://cowanconsult.co.uk/wp-content/uploads/2021/11/Capture-2.png](https://cowanconsult.co.uk/wp-content/uploads/2021/11/Capture-2.png)
![https://cowanconsult.co.uk/wp-content/uploads/2021/11/Capture.PNG2_.png](https://cowanconsult.co.uk/wp-content/uploads/2021/11/Capture.PNG2_.png)
![https://cowanconsult.co.uk/wp-content/uploads/2021/11/IMG_20201023_152439338-scaled.jpg](https://cowanconsult.co.uk/wp-content/uploads/2021/11/IMG_20201023_152439338-scaled.jpg)
![Logos](https://cowanconsult.co.uk/wp-content/uploads/2023/01/logos.jpg)